Skip to product information
1 of 1

PRODUCT REF · CTS2010

Stainless Steel Chemical Hand Pump

Stainless Steel Chemical Hand Pump

  • Diesel
  • Gas Oil
  • Lubricant
£552.00£662.40 ex. VAT inc. VAT
£662.40 inc. VAT £552.00 ex. VAT
Regular price £552.00 GBP
Regular price £0.00 GBP Sale price £552.00 GBP
Sale Sold out
Approx 2-3 DaysPrice match guarantee

Estimate delivery costs

UK delivery Your tank, delivered when you need it
Manufacturer warranty Up to 10 years on selected tanks
OFTEC certified With installation service, selected tanks only
0% finance available Trade accounts welcome, apply on-site today
PayPal Pay in 3 Learn Klarna Pay in 30 days Learn
View full details

Stainless Steel Chemical Hand Pump

The Stainless Steel Chemical Hand Pump is a sturdy rotary hand pump for the manual dispensing of a wide range of fluids. This pump is suitable for use with corrosive chemicals, alcohols, acids, alkalis, oils, solvents, lubricants and also for use as a hand fuel pump.


Features:

  • Rotary Manual Oil, Diesel and Chemical Hand Pump
  • Stainless steel and Teflon consutrction
  • Max flow rate: 280ml/rotation
  • Max viscosity: 410cSt
  • 1'' curved spout
  • 2'' bung adaptor
  • 3 part 1060mm suction pipe

Specification

  • Max Flow (ml/rotation) - 280
  • Suction Inlet – 1 1/4'' O/D
  • Suction Length – 1060mm
  • Dispensing Outlet – 1'' O/D – Bent Spout
  • Mounting – 2” BSP
  • Chemicals, diesel, oil
Specifications
Product RefCT
Lead time (working days)3
Delivery Terms

Approx 2-3 Days

The delivery of a tank can be confusing as each manufacturer offers a slightly different service and lead time. Please refer to our Delivery Information page. Standard tank deliveries are "kerbside", which means the tank will be delivered to the kerb only and not positioned further. Should you have specific delivery requirements or restrictions, please contact us to discuss.

Tanks over 2,500L — articulated lorry, customer offload

These tanks are delivered on an articulated vehicle (approximately 16.5m long × 2.6m wide × 3m high) which has no offloading on board. It is the customer's responsibility to offload the tank, which may require a telehandler or forklift.

Curtain-sided vehicles are also used, so please note that if there are obstacles or overhanging branches on the road to the delivery site, the driver may refuse to drive to the location due to the risk of damaging the vehicle. Please let us know about any obstructions before delivery so we can arrange alternative transport.

18-tonne tail-lift HGV

This vehicle is roughly the size of the largest bin lorries — approximately 8.2m long × 2.6m wide × 4m high, and often curtain-sided. If there are overhanging branches, these vehicles will not attempt the route, so a smaller vehicle should be requested.

Tanks are lowered to the ground but not positioned, as this is a kerbside delivery. If a smaller vehicle is required, email sales@fueltankshop.co.uk quoting your order number and name.

HIAB delivery

HIAB delivery is available but must be requested, and carries an additional cost. Email sales@fueltankshop.co.uk quoting your order number and name, and we'll come back to you with a price.

Accessories

Most accessories are delivered within 1–3 working days. Certain products and postcodes may take longer — check the product page for current information. If you need them sooner we can sometimes offer a next-day service; please contact us to discuss. If an item is out of stock we'll advise the expected lead time, and you're free to cancel for a full refund.

Returns Information

Customers may return items within 14 calendar days, as set out in section 7 of our Terms & Conditions.

All items must be returned unused. Refunds cannot be issued for used or previously installed items.

Please be aware that returning a tank can be complicated and expensive, so do check you're ordering the correct item — we strongly suggest checking the dimensions carefully before you buy.

How to return an item

  • Complete the form on our returns page with details of your order.
  • Once your request is approved, we'll issue a Returns Authorisation Number (RAN) along with instructions on how and where to return your order, and any costs involved.
  • Please do not return any goods without this authorisation. Goods cannot be accepted without a valid RAN.
  • Returns are not accepted at our Minehead office. Please wait until we contact you before returning anything.

Start a return request

Downloadable Documents
  • No documents available for this product.
General Safety Information

1. Always carefully read, thoroughly understand and follow the pump operating instructions. Use this pump correctly and with care for the purpose for which it is intended. Failure to do may cause damage or personal injury, and will invalidate the warranty. Retain instructions for future reference.

2. Contact your chemical or fluid supplier to check for compatibility with pump prior to installation and operation

3. Prior to use, always carefully and thoroughly read and understand the COSHH / MSDS information contained in the Safety Data Sheet supplied for the chemical which is to be pumped.

4. Wear protective clothing (goggles, face masks, long sleeves, long trousers, gloves, aprons, etc.) as set forth in the COSHH / MSDS Safety Data Sheet when pumping any hazardous chemicals.

5. Certain liquids, pump & containers should be grounded to avoid static electricity, refer to COSHH / MSDS sheets and site RA.

6. Use the pump in a ventilated area.

7. Pump should be washed out before it is used since processing lubricants may contaminate the fluids.

8. Prior to use, inspect your pump thoroughly verifying its proper assembly.

9. If pump is removed from drum, it should be thoroughly rinsed in a liquid that is compatible with both the pump and fluid.

Assembly and Installation

1. Check to see if all parts are included.

2. Assemble handle (Ref No. 13-15) to Handle Shaft (Ref No. 12). Align set screw (Ref No. 16) to indent of Shaft (Ref No. 2) and tighten the set screw (Ref No. 16)

3. In order to avoid leakage, please use appropriate sealant to seal three suction pipe (Ref No. 19). Insert the bung adapter (Ref No. 17+18) into suction pipe (Ref No. 19) and thread suction pipe (Ref No. 19) into pump inlet.

4. Insert pump and suction tube assembled with bung adapter into the drum, and then tighten bung adapter thumb screw (Ref No. 18) by hand. Be sure to set pump and suction tube assembly so that the suction tube is at the desired depth in the drum and is not blocked.

Operation

1. Ensure pump is securely mounted to the drum and all safety precautions have been observed.

2. Turn the handle in clockwise direction and discharge liquid into appropriate container.

3. Check that there are no leaks.

Warning: The pump will become harder to turn if used with high viscosity liquid (~400cSt), which may shorten the life of the pump.

4. Ensure pump is stored correctly and secured when not in use – refer to site RA.

Need help choosing?

Talk to a specialist.

Sizing, regulations, installation. Our team has been answering these questions since 2011.